News

POLITICS
← 一覧へ戻る

POLITICS

SOCIETYKisarazu - Awa-Kamogawa operation resumed due to the typhoon on the JR Uchifo LineKisarazu - Awa-Kamogawa operation resumed due to the typhoon on the JR Uchifo Linehttps://news.web.nhk/newsweb/na/nd-20260926de52563

DETAILS

The JR Uchibo Line in Chiba Prefecture, which had been abandoned due to Typhoon No. 25, resumed operation on the 26th between Kisarazu Station and Awa-Kamogawa Station. On the other hand, the section between Anegasaki Station and Kisarazu Station is expected to take a long time to recover, and will be replaced from the 28th...